Project

United Launch Alliance Crew Access Tower

The Crew Access Tower built by United Launch Alliance was constructed to support astronaut boarding operations for space travel missions, providing safe and efficient access for crews and ground personnel to the spacecraft through an elevated access arm. In addition to its access function, the tower houses critical utilities, communications systems, and safety infrastructure required […]

Project, FEATURED

NASA’s VAB High Bay 3 Modifications

NASA’s VAB High Bay 3 Platform modification project transformed the existing 525 feet tall Vehicle Assembly Building to handle the massive Space Launch System rockets. Structural modifications included reinforcing existing connections and structural members, Twenty (20) new access platforms for rocket assembly and maintenance, and adding seismic bracing to safely support the taller, heavier SLS

Project, FEATURED

Miramar Marine Corps Hangar No. 7

Hangar 7 at Marine Corps Air Station Miramar in San Diego, CA was designed and constructed to support MV-22 Osprey and CH-53 helicopter operations. It provides spacious maintenance bays and specialized areas for training exercises, ensuring squadron readiness and operational efficiency. The hangar’s open interior is made possible by long-span box trusses and girders, which

Project, FEATURED

University of Memphis Simmons Bank Liberty Stadium Expansion

The Simmons Bank Liberty Stadium expansion at the University of Memphis is a transformative renovation designed to modernize the venue’s functionality, enhance the fan experience, and support year-round events. The project includes major upgrades such as a new West Side Tower featuring premium seating areas, expanded club levels, and a first-of-its-kind suspended kitchen to serve

Project, FEATURED

Assembly Yards Film Studios

The Assembly Yards film studio complex in Doraville, Georgia was developed by transforming the sprawling former General Motors assembly plant into a cutting-edge entertainment production campus. The project spans nearly one million square feet and includes soundstages, mill space, production offices, warehouses, and themed backlot façades designed to accommodate a wide range of filming needs.

Project, FEATURED

Thomas A. Fanning Student-Athletic Performance Center

The Thomas A. Fanning Student-Athlete Performance Center at the Georgia Institute of Technology is a 100,000-square-foot athletic support facility located at the northeast corner of Bobby Dodd Stadium at Hyundai Field in Atlanta. Designed as a centralized hub for Georgia Tech’s athletic programs, the building houses strength and conditioning areas, sports medicine and recovery spaces,

Project, FEATURED

Confidential Data Center – Virginia

This project was completed for a confidential client. Due to the highly sensitive nature of the facility, project details cannot be publicly shared. Please contact Steel, LLC’s Sales Team to learn how we can support your next data center project. Architect Confidential Structural Engineer Confidential General Contractor Confidential Tonnage 10,528 tons Square Footage 172,163 sf

Project, FEATURED

Confidential Data Center – Pennsylvania

This project was completed for a confidential client. Due to the highly sensitive nature of the facility, project details cannot be publicly shared. Please contact Steel, LLC’s Sales Team to learn how we can support your next data center project. Architect Confidential Structural Engineer Confidential General Contractor Confidential Tonnage 7,069 tons Square Footage 1,000,000 sf

Project, FEATURED

Erlanger Hospital East Patient Tower & OR Expansion

The Erlanger Health System East Campus expansion in Chattanooga was a major healthcare modernization project that added both a new patient tower and expanded surgical services to transform the facility into a more comprehensive hospital. The project included the construction of a roughly 99,000-square-foot, multi-story patient tower providing approximately 58–64 new inpatient beds. In addition,

Project, FEATURED

Sequoyah Middle & High School Campus

The new Sequoyah Middle and High School campus under construction in Doraville, Georgia, will replace aging buildings and serve the growing student population in northern DeKalb County. The 485,000-square-foot campus is designed for about 2,800 students and will include more than 150 classrooms, science labs, career and technical spaces, and fine arts areas. Its modern

Scroll to Top